by KriEdholm | Nov 11, 2021 | IT Projects
Arcata’s Link 16 Team played a key role in the engineering of a satellite based External Time Reference (ETR) network on range which provides warfighters the ability to transition between Areas of Responsibility without having to change Link 16 networks or... by KriEdholm | Nov 11, 2021 | IT Projects
To ensure that a critical range safety system at the base had full redundancy, Arcata IT engineers and system administrators designed and implemented a secondary backup system at an off-site location. They leveraged an existing network and virtual machine architecture...
Recent Comments